How long will the renovation last?

We are estimating the project to take 3-4 months to complete starting in early September.  As with any project this size it is a tentative time frame.  We will keep members informed on a regular basis and will post an end date when we know it. 

 

What spaces will be impacted by the construction?

The men’s & women’s locker rooms, as well as the family changing room, will be renovated.  The Cycling Studio will temporarily be located in the first floor Cybex Room as we will convert the current studio into temporary changing space for women.  The equipment in the Cybex Room will be out of service during this time.  We do not anticipate any other program space to be affected by construction. 

 

Will the pool remain open?

Yes.  At this time, the pool will remain open during the entire renovation.  However, there may be an un-expected need during the project to close the pool.  Members will be given notice in advance if this is the case.

 

Will members have access to changing rooms, showers and restroom?

We will do our best to accommodate all our members.  During shut down of the locker rooms, we will temporarily convert the Cycling Studio into the women’s changing room. Men will have access to the back half of their locker room to change only.  Men utilizing the pool will have access to the current family changing room until the renovation in that space begins.  Restrooms are located outside the Fitness Center and in the Main Lobby.  Showers will not be available during construction.  Valuables are encouraged to not be brought into the Y or be secured at the front desk.

 

If I rent a locker will I get my same locker back?

No.  We will be replacing all the lockers and also re-configuring the space to add more lockers. 

 

Will members be informed on progress of the project?

Yes.  Updates will be posted in the facility, on the TV in the main lobby, via social media, on our website and through email.  Please check in regularly to see updates.